The Plan
How your community can help to shape future development in Congleton
The Neighbourhood Plan is a relatively new type of planning document and is part of the government’s approach to planning in that it aims to give local people more of a say about what goes on in their Town.
The Plan that is is eventually produced has to comply with some important laws as set out in the Localism Act. One of these is that the Neighbourhood Plan must be in line with the National Planning Policy Framework (NPPF) and local policy, which in our case is Cheshire East Council Local Plan.
Although the Plan has to deal with key issues such as deciding where new housing and employment should be located, it will also look at a wide range of other issues such as:
– Protecting green space
– Determining how the town centre is best supported
– How important sites such as the Fairground site should be developed
– Improving cycling and walking provision
– Whether new community facilities are required and where they should be located
Protecting the town’s heritage and appearance whilst at the same time modernising its infrastructure
Confirming areas of the town which should remain as green open spaces
Improving the sustainability and vitality of the town’s retail centre
Attracting public and private sector investment
Retaining existing employers and attracting new employers to help create more local jobs
Increase housing in line with the Cheshire East Council Local Plan
Ensuring the area is easy and safe to move around for all modes of transport including walking and cycling
Creating a greener town
For formal updates on Congleton Neighbourhood see Neighbourhood Plans on the Cheshire East Website :
1.
Congleton via Town Council agrees it would benefit from a Neighbourhood Plan
2.
Seek approval for boundary area from Cheshire East (given as Town Boundary)
3.
Get interested people together to form work groups
4.
Communicate and gain initial ideas from residents
5.
Analyse results and start working on policies and visions
6.
Go back to residents with more detailed and probing questions to check on track
7.
Use the results to hone polices
8.
Consult again if needed - or submit to Cheshire East
9.
Cheshire East consult statutory groups and check the plan is in line with national and local policies
10.
Congleton makes changes where needed
11.
Congleton’s Plan goes to an external planning inspector. Stage reached in 2018. Plan withdrawn for more work. Back to stage 5/6
12.
Either more work needed or goes out to residents for a vote
13.
If accepted - will be used as a Planning Document to guide development in Congleton
The process is complete